Urine Analysis

URINE
Can be requested without a referral
Test details
Specimen type
Urine · Urine sediment — Sterile leak-proof urine container
Category
Urinalysis
Code
URINE
Preparation
Our directory has no preparation recorded for this test yet — read the general instructions, and ask the branch before your visit if you are not sure.
Available branches
These are the laboratory’s open branches; our directory does not tie this test to a particular branch.
East Branch
الخبر
Main Branch
الرياض
North Branch
الرياض
This information is general and does not replace consulting your doctor. Choosing the right test for your condition is their call.