LDL Cholesterol

LDL
Fasting required Can be requested without a referral
Test details
Specimen type
Serum or plasma — Serum separator tube — gold cap
Category
Clinical chemistry
Code
LDL
Preparation
Fasting for 9 to 12 hours. Only water is allowed.
Available branches
These are the laboratory’s open branches; our directory does not tie this test to a particular branch.
East Branch
الخبر
Main Branch
الرياض
North Branch
الرياض
This information is general and does not replace consulting your doctor. Choosing the right test for your condition is their call.